Parse finished — 3 scope items from the spec and layout drawing. This one’s compact: 4 drives, sequencing logic, harmonic mitigation.
0.90engine confidence
You9:44 AM
Run the takeoff.
Estimator engineTakeoff9:44 AM
Running takeoff now. I’m sizing the VFDs from the pump schedule and deriving reactor counts from the harmonic spec. Should take a couple of minutes — the layout drawing needs measurement extraction.
Takeoff
Derived quantities
0 lines
Running takeoff
Deriving quantities from scope items and drawing measurements.
Results stream in as the engine works — you can keep talking in the meantime