BID-2418

Riverside Pump Station VFD Retrofit

  1. Session started

  2. Estimator engineParse9:42 AM
    Parse finished — 3 scope items from the spec and layout drawing. This one’s compact: 4 drives, sequencing logic, harmonic mitigation.
    0.90engine confidence
  3. You9:44 AM
    Run the takeoff.
  4. Estimator engineTakeoff9:44 AM
    Running takeoff now. I’m sizing the VFDs from the pump schedule and deriving reactor counts from the harmonic spec. Should take a couple of minutes — the layout drawing needs measurement extraction.